Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts

Friday, April 9, 2010

2nd floor construction update

Per Eric's update on the Devcon 2nd Floor G-Line construction, it looks like the Gov Docs will be covered on Monday and probably inaccessible through Tuesday. So during this time, please consult with Lucia, Jan, or me about possible alternate access to government documents.

Thursday, April 8, 2010

2nd floor construction


Devcon is currently de-constructing the wall along G-line in the Reference shared work area, and will begin work in the second floor stacks area next Monday, April 12. It will take at least Monday and Tuesday to complete the work. As on the other floors, plastic will be draped from floor to ceiling by the contractor, and additional plastic sheeting will placed over the stacks by Operations and Preservation.

If you have any questions or concerns, please do not hesitate to contact me.

Eric

Operations