Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Friday, April 9, 2010
2nd floor construction update
Per Eric's update on the Devcon 2nd Floor G-Line construction, it looks like the Gov Docs will be covered on Monday and probably inaccessible through Tuesday. So during this time, please consult with Lucia, Jan, or me about possible alternate access to government documents.
Thursday, April 8, 2010
2nd floor construction
Devcon is currently de-constructing the wall along G-line in the Reference shared work area, and will begin work in the second floor stacks area next Monday, April 12. It will take at least Monday and Tuesday to complete the work. As on the other floors, plastic will be draped from floor to ceiling by the contractor, and additional plastic sheeting will placed over the stacks by Operations and Preservation.
If you have any questions or concerns, please do not hesitate to contact me.
Eric
Operations
Subscribe to:
Posts (Atom)